Data Centre Investment
UK data centres, including AI data centres, screened on power capacity, tenant covenant, lease length and connectivity.
What is data centre investment?
Data centre investment means owning the buildings and land that house servers for cloud computing, AI and digital services. A data centre (or data center) is valued mainly on its power capacity, its tenants and the length and strength of its leases.
Demand is being driven by cloud computing and, increasingly, AI. But in the UK, the binding constraint is not demand. It is power. Access to grid capacity now decides where data centres can be built and what they are worth.
Key facts
London holds 1,637MW, or 91%, of the UK's 1,803MW live data centre capacity (Savills, June 2026).
UK data centre vacancy fell to 8% in Q1 2026, from 27% in 2016. London is lower still, at 7% (Savills).
Take-up hit a record 217MW in 2025, and developers in parts of West London are planning for multi-year waits for firm grid capacity (Savills).
Sources: Savills, UK data centre take-up continues to concentrate on London (June 2026) · Last updated 23 November 2026
AI data centres and the UK power squeeze
AI has changed what a data centre needs. Training and running AI models requires far more power per rack than traditional cloud computing, and that power generates heat that must be removed, often using liquid cooling.
In the UK, demand is concentrated in and around London, where connectivity and customers are. But grid capacity there is tight. That pushes some development to regions with available power, including the government's AI Growth Zones, which are designed to speed up planning and power connections for large AI data centres.
For investors, this means a site with secured power can be worth far more than a similar site without it.
Types of data centre
Hyperscale data centres
Very large facilities built for, or leased to, major cloud and AI companies. Long leases to strong tenants, but large single-tenant exposure.
Colocation data centres
Operators lease space, power and cooling to many customers. More diversified income, but more operational risk.
Edge data centres
Smaller sites close to users, built for low-latency services. Location and connectivity matter most.
How we score data centres
Every data centre is scored on value, yield and risk using five core inputs.
Tenant covenant
The financial strength of the occupiers, from hyperscale cloud providers to smaller colocation customers.
Lease length and structure
How long the income is secured, and who carries the cost of power and upgrades.
Power capacity and grid access
Secured megawatts, connection dates and the ability to expand. This is usually the biggest driver of value.
Connectivity and location
Fibre routes, proximity to users and latency, especially important near London.
Cooling, water and specification
Cooling technology, water usage, power density and energy efficiency, which determine whether a facility can serve AI workloads.
Data centre investment risks
Every score shows where the downside sits, so you can judge whether the price reflects it.
Power constraints
Without secured grid capacity, sites cannot be built, expanded or let.
Technology obsolescence
Facilities designed for older, lower-density servers may struggle to support AI without costly upgrades.
Data centre water usage and energy demand face growing public and regulatory attention.
Water and environmental scrutiny
Where data centre pricing can be wrong
Data centres are often priced on income and tenant strength alone. But in a power-constrained market, a site's secured grid capacity and expansion potential can be worth more than the building itself.
We look for assets and sites where power, connectivity or development potential is not reflected in the price, including older industrial or retail sites with strong grid connections. Equally, we flag facilities whose specification may not meet AI demand, where a long lease today may not protect value at expiry.
Data centre investment FAQs
What is an AI data center?
A data center designed for AI workloads, with very high power density and advanced cooling, often liquid cooling, to support the servers used to train and run AI models.
Why is power so important for data centre value?
A data centre cannot operate or grow without grid capacity. In constrained markets such as London, secured power is often the biggest driver of value.
How much of UK data centre capacity is in London?
In June 2026, Savills reported that London held 1,637MW, or 91%, of the UK's 1,803MW live capacity.
How much water does a data center use?
It depends on the cooling design. Some systems use large amounts of water, while closed-loop and liquid cooling can reduce it significantly. Water usage is increasingly part of planning and investment decisions.
What is the difference between hyperscale and colocation data centres?
Hyperscale facilities are built for one large cloud or AI provider. Colocation facilities rent space, power and cooling to many customers.
See data centre opportunities matched to your mandate
Join the waitlist for early access to ranked, expert-validated opportunities.
© 2026 AI CoVal, a trading name of Pengen Consulting Ltd. Registered in England & Wales, No. 17427141. Registered office: 71-75 Shelton Street, Covent Garden, London, United Kingdom, WC2H 9JQ
Not financial advice. Do your own due diligence.