Data Centre Investment

UK data centres, including AI data centres, screened on power capacity, tenant covenant, lease length and connectivity.

Aerial view of a data centre with cooling units in a rural setting
Aerial view of a data centre with cooling units in a rural setting

What is data centre investment?

Data centre investment means owning the buildings and land that house servers for cloud computing, AI and digital services. A data centre (or data center) is valued mainly on its power capacity, its tenants and the length and strength of its leases.

Demand is being driven by cloud computing and, increasingly, AI. But in the UK, the binding constraint is not demand. It is power. Access to grid capacity now decides where data centres can be built and what they are worth.

Key facts

  • London holds 1,637MW, or 91%, of the UK's 1,803MW live data centre capacity (Savills, June 2026).

  • UK data centre vacancy fell to 8% in Q1 2026, from 27% in 2016. London is lower still, at 7% (Savills).

  • Take-up hit a record 217MW in 2025, and developers in parts of West London are planning for multi-year waits for firm grid capacity (Savills).

Sources: Savills, UK data centre take-up continues to concentrate on London (June 2026) · Last updated 23 November 2026

AI data centres and the UK power squeeze

AI has changed what a data centre needs. Training and running AI models requires far more power per rack than traditional cloud computing, and that power generates heat that must be removed, often using liquid cooling.

In the UK, demand is concentrated in and around London, where connectivity and customers are. But grid capacity there is tight. That pushes some development to regions with available power, including the government's AI Growth Zones, which are designed to speed up planning and power connections for large AI data centres.

For investors, this means a site with secured power can be worth far more than a similar site without it.

Electricity substation supplying power to a data centre
Electricity substation supplying power to a data centre

Types of data centre

Hotel building facade, representing a leased hotel
Hotel building facade, representing a leased hotel
Hyperscale data centres

Very large facilities built for, or leased to, major cloud and AI companies. Long leases to strong tenants, but large single-tenant exposure.

Hotel reception, representing a managed hotel operation
Hotel reception, representing a managed hotel operation
Hotel room key card, representing a franchised hotel brand
Hotel room key card, representing a franchised hotel brand
Colocation data centres

Operators lease space, power and cooling to many customers. More diversified income, but more operational risk.

Edge data centres

Smaller sites close to users, built for low-latency services. Location and connectivity matter most.

How we score data centres

Every data centre is scored on value, yield and risk using five core inputs.

Data centre cooling system used to assess AI-ready specification
Data centre cooling system used to assess AI-ready specification

Tenant covenant

The financial strength of the occupiers, from hyperscale cloud providers to smaller colocation customers.

Lease length and structure

How long the income is secured, and who carries the cost of power and upgrades.

Power capacity and grid access

Secured megawatts, connection dates and the ability to expand. This is usually the biggest driver of value.

Connectivity and location

Fibre routes, proximity to users and latency, especially important near London.

Cooling, water and specification

Cooling technology, water usage, power density and energy efficiency, which determine whether a facility can serve AI workloads.

Data centre investment risks

Every score shows where the downside sits, so you can judge whether the price reflects it.

Power constraints

Electricity pylons representing data centre power constraints
Electricity pylons representing data centre power constraints

Without secured grid capacity, sites cannot be built, expanded or let.

Older server room representing technology obsolescence risk
Older server room representing technology obsolescence risk
Cooling towers representing data centre water usage risk
Cooling towers representing data centre water usage risk

Technology obsolescence

Facilities designed for older, lower-density servers may struggle to support AI without costly upgrades.

Data centre water usage and energy demand face growing public and regulatory attention.

Water and environmental scrutiny

Where data centre pricing can be wrong

Data centres are often priced on income and tenant strength alone. But in a power-constrained market, a site's secured grid capacity and expansion potential can be worth more than the building itself.

We look for assets and sites where power, connectivity or development potential is not reflected in the price, including older industrial or retail sites with strong grid connections. Equally, we flag facilities whose specification may not meet AI demand, where a long lease today may not protect value at expiry.

Data centre investment FAQs

What is an AI data center?

A data center designed for AI workloads, with very high power density and advanced cooling, often liquid cooling, to support the servers used to train and run AI models.

Why is power so important for data centre value?

A data centre cannot operate or grow without grid capacity. In constrained markets such as London, secured power is often the biggest driver of value.

How much of UK data centre capacity is in London?

In June 2026, Savills reported that London held 1,637MW, or 91%, of the UK's 1,803MW live capacity.

How much water does a data center use?

It depends on the cooling design. Some systems use large amounts of water, while closed-loop and liquid cooling can reduce it significantly. Water usage is increasingly part of planning and investment decisions.

What is the difference between hyperscale and colocation data centres?

Hyperscale facilities are built for one large cloud or AI provider. Colocation facilities rent space, power and cooling to many customers.

an abstract photo of a curved building with a blue sky in the background

See data centre opportunities matched to your mandate

Join the waitlist for early access to ranked, expert-validated opportunities.

© 2026 AI CoVal, a trading name of Pengen Consulting Ltd. Registered in England & Wales, No. 17427141. Registered office: 71-75 Shelton Street, Covent Garden, London, United Kingdom, WC2H 9JQ

Not financial advice. Do your own due diligence.